The animation in the above video shows a walkthrough of the future Bruins Bistro cafeteria to be located on the Battle Creek campus of Kellogg Community College. Construction — part of the current Student Center renovations underway on the campus — is scheduled to begin on this area of the Student Center at the end of July and should be completed in the late spring or early summer of 2013. Continue to watch this blog for construction updates or check out our Facebook page and our Twitter feed.